Design and Project Management, Speedy, Super Workshop, Erith

Bradley-Mason LLP were pleased to act as lead consultants and project managers in the creation of the Erith “Super Workshop” for Speedy Asset Services. A lengthy consultation with operational and managerial stakeholders from all four divisions of the business formed an essential part of the procurement process.

Click here to Download our Case Study PDF

Firstmost Darlington Dilaps to Project Management

Bradley-Mason LLP were engaged to inspect a vacated retail premises in a high street location in Darlington. The previous Tenant’s Lease had expired and
the unit was left in poor condition with external defects and redundant shop fittings. A thorough inspection was made and a detailed Schedule of Dilapidations prepared in accordance with the Lease and the relevant clauses.

Click here to Download our Case Study PDF

Project Management of Refurbishment Skelton Group, Birmingham

Project Management of a bespoke, fully refurbished, manufacturing facility for press technology in support of leading brands within the automobile industry.

Click here to Download our Case Study PDF

Acquisition and Project Management – Toolstation

As preferred property consultants for Toolstation Ltd, Bradley-Mason are pleased to have been involved in the leasehold acquisition and fit-out of their 2nd national distribution warehouse.

Click here to Download our Case Study PDF

New Build of Temporary Hire Facilities

Design and project manage the creation of two separate tool hire facilities located on the London 2012 Olympic Park construction site.

Click here to Download our Case Study PDF

National Trade Counter Roll Out – Toolstation

Bradley-Mason have been working with Toolstation Ltd for over 9 years as lead property consultants in their expansion and national roll-out of trade counters and warehouses.

Click here to Download our Case Study PDF